As Crossrail is nearing completion, it seems a lifetime ago that DMC were in the thick of the design process for Crossrail, before works were even tendered. This is the first prototype for the block DDA skirtings, now installed on all stations. The original design included weep holes, which were removed for the final design. We pride ourselves on our experience and knowledge which enables us to provide assistance in the early stages of design for these major projects.

DMC provide a holistic service from design through to completion and will often be contacted to provide our expertise to assist architects with the practical side of the design, to ensure design concepts work on site and to provide value engineering.

 

Write a Reply or Comment

Your email address will not be published. Required fields are marked *